EXECUTIVE PERSONNEL AND MANPOWER AVAILABLE
PLVL is managed by group of distinguished professionals with wideexperience in chemical, petrochemical, marine, oil and gas engineering. A brief description of our Executive Personnel is enclosed at the end of this profile.
Tables 1 and 2 shows a detailed breakdown of our Key Personnel and Staff available.
S/N | NAME | DESIGNATION | QUALIFICATION |
1 | MANAGING DIRECTOR | B.SC | |
2 | TECHNICAL DIRECTOR | B Eng/COREN/MNATE | |
3 | PROJECT MANAGER | B Eng | |
4 | QA/QC MANAGER | B Eng/NACE II | |
5 | SHE COORDINATOR | B Eng/M PGM | |
6 | CONSTRUCTION ENGINEER | B Eng/COREN/MNATE | |
7 | SITE ENGINEER | B Eng/MNSE | |
8 | E & I ENGINEER | B Eng/MNSE | |
9 | STRUCTURAL ENGINEER | B Eng | |
10 | PROJECT ENGINEER | B Eng | |
11 | LEAD DESIGN ENGINEER | B Eng | |
Curriculum Vitae of personnel to be allocated to each project or contract are usually enclosed in the Contract execution plans development for each specific project and submitted to client during the front-end planning of such contracts. We also have the capacity to source and mobilize additional experienced personnel for specialist activities if required.
Table 2 – Breakdown of Company Personnel Available
Category | Qty | Nationality | Status |
Engineers | 5 | Nigerian | Contract |
Draughtsmen | 2 | “ | Permanent |
Marine Engineers/Chief Mates | 6 | “ | Contract |
Marketing Staff | 2 | Nigerians | Permanent |
Mechanical Technicians | 5 | “ | Contract |
Electrical Technicians | 5 | “ | Contract |
Instrumentation Technicians | 4 | “ | Contract |
Metal Fabricators | 4 | “ | Contract |
Pipe Fitters | 5 | “ | Contract |
ASME IX Coded Welders – SMAW | 4 | “ | Contract |
ASME IX Coded Welders – GTAW | 4 | Contract | |
Painters | 6 | “ | Contract |
Administration | 2 | “ | Contract |
Logistics Supervisors | 2 | “ | Contract |
Materials Supervisors | 2 | “ | Contract |
Labour | 40 | “ | Contract |
Trade Contractors (Various Skills) | 20 | Nigerians | Contract |
Pump/Generator Operators | 10 | Nigerian | Contract |
FACILITIES & EQUIPMENT AVAILABLE
As an organization, we understand only the best can help us in delivering our projects on time as such deliberate effort is on hand to ensure only up to date equipment are mobilize for all our projects. Project equipment template shall be issue before pre-mob.